沙特吉贊F7006房建項目水泵泵組材料采購公告055

發(fā)布時間: 2024-11-18
查看原文
摘要信息
招標單位 CHEAC 地區(qū)
發(fā)布時間 2024-11-18 項目編號
投標截止時間 開標時間
項目分類 招標 行業(yè)分類 風機電機水泵
相關(guān)產(chǎn)品 水泵泵組材料
正文內(nèi)容
公告標題:
沙特吉贊F7006房建項目水泵泵組材料采購公告055
公告內(nèi)容:
 1.The unit price of the above goods is fixed during the supply period and will not be adjusted.
   2.The price of this Purchase Order includes all expenses incurred by the supplier in performance of this Purchase Order, which include but no limited to production, packaging, storage, transportation, taxes, risks, etc.
   3.The quantity of goods in this Purchase Order is provisional, and the CHEAC has the right to adjust it according to CHEAC’s requirements; the measurement shall be based on the quantity actually supplied by the supplier and accepted by the CHEAC. Supplier shall not make any claim to CHEAC for the adjustment of quantity. CHEAC has the right to increase the obligation of Supplier, which request Supplier supply more quantity at the same price beyond the Purchase Order, but it shall not exceed 15% of the Purchase Order value.
   4.The Supplier has carefully read the bidding documents/inquiry documents provided by CHEAC, fully understands and agrees to supply goods in accordance with the specifications required by the documents. In addition, the material test certificate (MTA) shall be approved by CHEAC and Employer.
   5.The Supplier shall provide documents or certificates for goods, including but not limited to delivery notes, product factory certificates, inspection reports, product certificates or manufacturers' relevant certificates. CHEAC will not be responsible for any additional costs or infringements and disputes arising from the documents and certificates.
   6.If the goods are rejected by CHEAC due to low quality or non compliance on CHEAC’s requirement, the Supplier shall replace it with qualified and acceptable ones at his own cost within 3 days, and CHEAC reserve the right to claim for the lost cause by it.
   7.The Supplier shall take measures to prevent goods from damage until the goods are received by CHEAC. Once the goods is damaged before the receipt, CHEAC has the right to deduct payment or request Supplier to replace it.
   8.CHEAC has the right to terminate this purchase order, once :
1)The Supplier fails to comply with CHEAC's reasonable instructions and HSE requirements; or 
2)The Supplier are unable to deliver goods on time; or 
3)The Supplier fails to replace goods rejected by CHEAC on time; or 
4)There are clear signs that the Supplier is unable or unwilling to perform this Purchase Order; or 
5)CHEAC makes decision to terminate it based on its consideration.
   9.Once CHEAC terminates this Purchase Order in accordance with the above terms, the two parties shall measure and settle the quantity of materials already delivered. The Supplier shall not be entitled to claim for any cost other than the materials delivered.
物資信息
序號
設備物資名稱
設備物資說明
數(shù)量
單位
1
其他專用材料及工器具
采購清單詳見附件1
1
最新設備項目中標
廣西魚峰混凝土有限公司2024年度濕拌砂漿外加劑采購項目成交結(jié)果公示 襯板螺栓詢比價-華新水泥(富民)有限公司-中選公告 色母料(金黃)商談-華新水泥股份有限公司包裝分公司-中選公告 廢物處理(含運輸)商談-揚州市華新江陽混凝土有限公司-中選公告 保安招選-華新水泥(襄陽)有限公司-中選公告 防城港中港建設工程有限責任公司廣西貴港北港國際集裝箱碼頭有限公司職工食堂裝修工程-勞務分包-采購結(jié)果公告 2024年11月-平南水泥-潛水渣漿泵定子(緊急計劃)-公開詢比價詢價結(jié)果公告 北海港鐵山港西港區(qū)石頭埠作業(yè)區(qū)19號泊位工程船舶污染海洋環(huán)境風險評估報告-采購項目結(jié)果公告 060202 機械設備維護詢比價-常州市華新混凝土有限公司永寧分公司-中選公告 《大同市金龍商品混凝土有限責任公司輔材配件采購項目》結(jié)果公告 江華塑品瓷磚膠袋詢比價公示中標公示 冀東水泥重慶合川有限責任公司炭黑羅茨風機維修詢比價-結(jié)果公告 斷路器、接觸器詢比價-華新水泥(昭通)有限公司-中選公告 蓄能器(可充電電池)詢比價-華新水泥(大冶)有限公司-中選公告 陜西區(qū)域扶風公司傳動滾筒維修詢比價-結(jié)果公告 陜西區(qū)域扶風公司一線循環(huán)風機電機轉(zhuǎn)子繞線短接環(huán)維修詢比價-結(jié)果公告 儲存及小型搬運設備及用品詢比價-華新紅塔水泥(景洪)有限公司-中選公告 斷路器、接觸器詢比價-華新水泥(黃石)有限公司-中選公告 粒化高爐礦渣Ⅰ商談-華新水泥股份有限公司-中選公告 2024年11月-金崗水泥-變頻器維修-公開詢比價詢價結(jié)果公告

訂閱推送最新項目

掃碼打開小程序